Ready Mix Concrete Guide Australia | Ordering, Delivery & Placement
Concrete Supply & Placement Guide

Ready Mix Concrete Guide

Ready Mix Concrete Is Batched At A Concrete Plant And Delivered To The Project As Fresh Concrete. A Successful Pour Depends On More Than Ordering The Right Cubic Metres. Mix Specification, Site Access, Truck Timing, Pumping, Placement Speed, Workability, Finishing And Curing All Need To Be Considered Before The First Truck Arrives.

Plant-Batched Concrete Order In m³ Truck & Pump Access Placement & Finishing Curing & Quality
Ready Mix Concrete Process

From Batching Plant To Finished Concrete

Ready-Mixed Concrete Moves Through A Controlled Chain Of Batching, Transport, Placement, Finishing And Curing.

1

Specify

Confirm The Required Concrete Mix, strength, exposure, slump and any project-specific requirements.

2

Batch

The Plant Measures Cementitious Materials, water, aggregates and admixtures in controlled quantities.

3

Mix

The Ingredients Are Combined To Produce Uniform Fresh Concrete.

4

Deliver

Agitating Trucks Transport Fresh Concrete To The Job Site.

5

Discharge

Concrete Is Discharged Directly, By Chute, By Pump Or Through Another Planned Placement Method.

6

Place

The Crew Deposits And Spreads Concrete Without Unnecessary Delay Or Segregation.

7

Finish

The Surface Is Screeded, floated, trowelled, broomed or textured as required.

8

Cure

The Concrete Is Protected So Hydration And Strength Development Can Continue.

Figure B

How Ready Mix Concrete Reaches The Site

Ready-Mix Concrete Is Produced At A Batching Plant, Transported In A Truck And Then Placed Into The Prepared Work Area.

Batching Plant Cement + Water Sand + Aggregate Agitator Truck Transport Fresh Concrete To Site Discharge Chute • Pump Or Planned Method Place • Compact • Screed • Finish Fresh Concrete Becomes The Finished Slab Or Element After Placement Protect + Cure + Allow Strength To Develop
Specify → Batch → Mix → Deliver → Discharge → Place → Finish → Cure
Ready Mix Concrete Guide

What Is Ready Mix Concrete?

Ready Mix Concrete Is Concrete Produced At A Central Batching Plant And Delivered To The Construction Site While It Is Still Fresh. The materials are measured in controlled proportions, mixed and transported in an agitator truck so the concrete arrives ready for placement.

Ready Mix Is Commonly Used For Slabs, driveways, footings, walls, columns, paths and larger concrete pours because it allows a planned quantity of fresh concrete to be delivered directly to the work area.

How Ready Mix Concrete Is Batched

The Plant Measures The Required Cementitious Materials, water, fine aggregate, coarse aggregate and admixtures according to the specified mix. Modern batching plants use weighing and control systems to improve consistency between loads.

How Ready Mix Concrete Is Transported

Fresh Concrete Is Commonly Carried In A Rotating Drum Truck. The drum agitates the concrete during transport. The objective is to maintain uniformity and deliver the material in a condition suitable for placement.

What Information To Confirm Before Ordering

Before Ordering Ready-Mix Concrete, Confirm The Required Volume, concrete specification, site address, access conditions, placement method, pour start time and any special project requirements. If a concrete pump is needed, coordinate the pump and concrete delivery schedule together.

Ordering Tip: Do Not Order Concrete Only By Guessing The Floor Area. Convert The Actual Slab, Footing, Beam Or Other Geometry Into Cubic Metres And Include Any Appropriate Ordering Allowance.

Concrete Volume

Ready Mix Concrete Is Commonly Ordered By Cubic Metre. For A Simple Slab, multiply length by width by thickness in metres. Complex projects should be broken into separate shapes so each volume can be checked before the total is added.

Simple Slab Volume Concrete Volume (m³) = Length (m) × Width (m) × Thickness (m)

What Is Slump?

Slump Is A Measure Used To Assess The Consistency Of Fresh Concrete. It relates to how workable the concrete is, but slump is not the same as concrete strength. The required slump should match the mix specification and placement method.

Why Extra Water Should Not Be Added Casually

Uncontrolled Water Addition Can Change The Intended concrete mix. If workability adjustment is required, follow the supplier's approved procedure or project specification rather than adding water simply because the concrete appears stiff.

Truck Access

A Concrete Truck Is Large And Heavy. Before Delivery, Check driveway width, turning space, overhead clearance, ground bearing capacity, gates, power lines and the distance from the truck to the pour. Poor access can change the placement method or require pumping.

Concrete Pumping

A Concrete Pump Can Move Fresh Concrete From The Truck To Areas That Are Difficult To Reach By Chute. Pump selection depends on distance, height, access and the concrete mix. Pump setup space and hose or boom positioning should be planned before trucks arrive.

Truck Chute Placement

Where Access Allows, Concrete May Be Discharged Directly From The Truck Chute. This can be efficient for accessible slabs and footings, but the truck must be able to reach the placement point safely without damaging the site.

Timing Multiple Trucks

Larger Pours May Need Several Trucks. Delivery intervals should match the crew's placement speed so one truck is not waiting excessively while another arrives too late. Poor sequencing can create delays and make finishing more difficult.

Placement

Fresh Concrete Should Be Deposited As Close As Practical To Its Final Position. Excessive dragging, rehandling or long drops can encourage segregation. The crew should be ready before the first truck arrives.

Compaction

Depending On The Element, Vibration Or Other compaction methods may be used to reduce entrapped air and help concrete fully surround reinforcement and fill formwork.

Screeding

Screeding Brings A Slab Surface To The Planned level and profile. Good screeding depends on accurate forms, level control and suitable concrete consistency.

Floating And Finishing

After Screeding, The Surface May Be Floated, trowelled, broomed or textured depending on the required finish. The finishing sequence should match the project and weather conditions.

Control Joints

Concrete Shrinks As It Dries. Control joints are used to encourage cracking at planned locations. Joint layout, timing and depth should be coordinated with slab thickness and geometry.

Curing

Curing Begins After Placement And Finishing. It helps maintain conditions that support cement hydration and property development. The curing method should suit the concrete, weather and project requirements.

Hot Weather

High Temperature, Wind And Low Humidity Can Increase evaporation and reduce available finishing time. In hot weather, the crew may need to plan delivery, placement and curing carefully to protect the fresh concrete.

Cold Weather

Low Temperatures Can Slow Setting And Strength development. Very cold conditions may require special measures. Follow supplier and project guidance for cold-weather placement.

Rain

Rain Can Affect Fresh Concrete Surfaces And Finishing. Weather forecasts and site protection should be considered before the pour. Surface water should not be worked into fresh concrete.

What This Guide Does Not Replace

This Guide Does Not Specify A Concrete Mix, structural strength, slump, reinforcement or curing system for a particular project. Use the project specification, current supplier information and qualified advice where required.

Ready-Mix Pour Planning

Four Checks Before The Concrete Truck Arrives

A Well-Planned Pour Reduces Delays, Confusion And Unnecessary Concrete Handling.

1

Quantity

Confirm The Concrete Volume And Any Appropriate Ordering Allowance.

2

Specification

Confirm The Correct Mix, strength, slump and project requirements.

3

Access

Check Truck, pump, chute and crew access before delivery.

4

Crew Ready

Have Forms, reinforcement, tools and curing materials ready before the first load.

Ready-Mix Ordering Checklist

Information To Confirm With The Supplier

Clear Ordering Information Helps Reduce Delivery Problems And Mix Confusion.

Order ItemWhat To ConfirmWhy It MattersWho Usually Provides It
Concrete VolumeTotal cubic metres requiredControls delivered quantityEstimator / contractor
Concrete SpecificationRequired mix and strength detailsEnsures correct concrete is suppliedProject documents
SlumpRequired fresh concrete consistencyAffects placement methodSpecification / supplier
Delivery TimeFirst truck arrival and truck spacingCoordinates crew and pumpContractor / supplier
Site AccessTruck and pump access limitationsDetermines discharge methodSite team
Placement MethodChute, pump or other planned methodAffects logistics and equipmentContractor
WeatherHeat, rain, wind or cold riskAffects placement and curingSite team
Ready Mix Vs Site Mixing

Ready Mix Concrete Compared With Site-Mixed Concrete

Ready-Mixed Concrete And Site-Mixed Concrete Both Produce Concrete, But The Production Method Is Different. Ready mix is batched at a plant and delivered fresh, while site mixing measures and combines the materials at the project location.

FeatureReady Mix ConcreteSite-Mixed Concrete
BatchingCentral batching plantAt or near the project
DeliveryAgitator truckNo truck delivery of fresh concrete required
Typical UseMedium and large poursSmall or limited-access jobs
QuantityOrdered in cubic metresMixed in smaller batches
Consistency ControlPlant-controlled batchingDepends heavily on site measurement and mixing
Site LogisticsTruck access and timing importantMaterial storage and mixing space important
Selection Tip: Use The Production Method That Matches The Required Volume, concrete specification, site access, project controls and available equipment.
Common Ready-Mix Mistakes

Mistakes To Avoid When Ordering Ready Mix Concrete

Ordering The Wrong Volume

Under-Ordering Can Cause A Costly Short Load Or Delay, while over-ordering creates waste and disposal problems. Measure the actual geometry carefully.

Not Checking Truck Access

A Concrete Truck May Not Be Able To Reach The Pour Area. If access is uncertain, plan a pump or other placement method before delivery.

Ordering The Wrong Mix

Concrete Strength, slump and other properties should match the project specification. Do not assume one mix is appropriate for every slab, footing or driveway.

Adding Too Much Water

Uncontrolled Water Addition Can Change The supplied concrete. Workability adjustments should follow the supplier's approved process or project requirements.

Not Having Enough Labour

Ready-Mix Concrete Arrives On A Delivery Schedule. If the crew cannot place and finish it efficiently, truck waiting time and quality risks can increase.

Ignoring Curing

The Pour Is Not Finished When The Surface Looks Complete. Curing is part of the construction process and should be planned in advance.

Related Concrete Resources

Useful ConcreteCreek.com Ready-Mix Tools And Guides

Use Related Resources When You Need To Estimate Concrete Quantity, Cost Or Placement Requirements.

Concrete Volume Calculator

Estimate Cubic Metres For Slabs, Footings And Other Common Shapes.

$

Total Concrete Cost Calculator

Apply Your Own Concrete Rate And Project Cost Allowances.

Mix

Cement Mix Calculator

Review Cement, Sand And Aggregate Quantity From User-Entered Mix Assumptions.

P

Concrete Pumping Cost Guide

Understand The Main Cost Drivers For Concrete Pumping And Site Access.

D

Concrete Driveway Thickness Guide

Review Driveway Thickness, base support, reinforcement and joints.

AU

ConcreteCreek.com

Browse Australian Concrete Calculators, Converters And Practical Guides.

Frequently Asked Questions

Ready Mix Concrete FAQs

Simple Answers About Ready-Mixed Concrete, Ordering, Trucks, Pumps, Slump, Placement And Curing.

What Is Ready Mix Concrete?

Ready Mix Concrete Is Batched At A Central Plant And Delivered To The Job Site As Fresh Concrete In An Agitator Truck.

How Is Ready Mix Concrete Ordered?

It Is Commonly Ordered By Cubic Metre Together With The Required Concrete specification, delivery time and placement information.

How Do I Know How Many Cubic Metres I Need?

Calculate The Volume Of Each Slab, footing, beam or other concrete element and add the volumes together.

What Is Concrete Slump?

Slump Is A Measure Of Fresh Concrete Consistency. The required slump should match the project specification and placement method.

Can I Add Water To Ready Mix Concrete On Site?

Uncontrolled Water Addition Can Change The intended mix. Follow the supplier's approved procedure or project requirements.

When Is A Concrete Pump Needed?

A Pump Is Common When The Truck Cannot Discharge Close Enough To The pour or when controlled placement over distance or height is required.

How Long Can A Concrete Truck Wait?

Delivery And Discharge Timing Depend On The Supplier, mix, weather and project conditions. Coordinate truck intervals with the supplier rather than assuming an unlimited waiting time.

Does Ready Mix Concrete Need Curing?

Yes. Ready-Mixed Concrete Still Requires Appropriate curing after placement and finishing.

Is Ready Mix Better Than Site Mixing?

Neither Method Is Automatically Better For Every Project. Ready mix suits many larger or controlled pours, while site mixing can suit smaller jobs depending on access and requirements.

What Should Be Ready Before The Truck Arrives?

Forms, reinforcement, access, crew, placement equipment, finishing tools and curing materials should all be prepared before delivery.

Can Ready Mix Concrete Be Used For Driveways And Footings?

Yes, Provided The Concrete supplied matches the project specification and placement requirements.

Does This Guide Specify A Ready-Mix Concrete Recipe?

No. This Is An Educational Guide. The required mix should come from the project specification, supplier or qualified professional where required.

Australian References

Useful Ready Mix Concrete Information Sources

Use Current Supplier Information, Project Documents And Industry Guidance When Ordering And Placing Ready-Mixed Concrete.

Cement Concrete & Aggregates Australia

Australian Industry Information And Technical Resources For Cement, Concrete And Aggregates.

Visit CCAA
Safe Work Australia

National Safety Information Relevant To Concrete Work, construction activities and silica exposure.

Read Silica Guidance
Your Ready-Mix Supplier

Confirm The Mix, slump, delivery conditions, truck access, waiting time and placement requirements.

Your Project Specification

Use The Required Concrete strength, exposure, reinforcement, placement and curing requirements for the actual project.