Cubic Feet to Cubic Yards Concrete Calculator | ft³ to yd³
Concrete Volume Conversion Tool

Cubic Feet to Cubic Yards
Concrete Calculator

Convert Cubic Feet To Cubic Yards For Concrete, Or Calculate The Volume From Length, Width And Depth Before Converting It. The Calculator Can Also Add A Waste Allowance, Estimate Concrete-Only Cost, And Show An Optional Bag Count When You Enter The Yield Printed On Your Concrete Bag. Every Numeric Entry Starts At 0 So The Result Comes Only From The Values You Enter.

ft³ To yd³1 yd³ = 27 ft³Concrete DimensionsWaste & CostMobile Friendly
Full Width Concrete Calculator

Choose How You Want To Calculate Concrete Volume

Select One Of The Four Options Below. All Numeric Inputs Start At 0. Enter Your Measurements, Then Press Calculate Concrete Volume To Reveal The Result.

ft³
Enter The Total Cubic Feet You Want To Convert.
yd³
Enter Cubic Yards To See The Equivalent Cubic Feet.
ft
ft
in
Qty
ft²
in
Qty

%
Optional. Add Only The Allowance You Want To Plan For.
$/yd³
Optional. Enter Your Local Supplier Rate.
ft³
Optional. Use The Yield Printed On The Exact Bag.
Planning Estimate Only: This Tool Converts The Measurements You Enter. Actual Concrete Orders Can Differ Because Excavation, Forms, Base Conditions, Thickened Edges, Spillage, Supplier Minimums And Field Dimensions Are Not Always Perfectly Uniform.
Your Concrete Estimate
0.00yd³

Your Result Will Appear Here After You Press Calculate Concrete Volume.

Base Cubic Feet0.00 ft³
Base Cubic Yards0.00 yd³
With Waste / Rounding0.00 yd³
Optional Bag Estimate
Equivalent Cubic Feet0.00 ft³
Optional Concrete Cost
Conversion Factor27 ft³ = 1 yd³
Waste Added0%

The PDF Includes The Calculation Mode, Base Cubic Feet, Base Cubic Yards, Waste Allowance, Rounded Planning Quantity, Optional Bag Estimate And Optional Concrete Cost.

Why One Cubic Yard Equals 27 Cubic Feet

A Cubic Yard Is Three Feet Long, Three Feet Wide And Three Feet High. Multiplying Those Three Dimensions Gives 27 Cubic Feet, Which Is The Exact Relationship Used By The Calculator.

1 yd³ = 27 ft³ 3 ft Long 3 ft Wide 3 ft High
3 ft × 3 ft × 3 ft = 27 ft³ = 1 yd³
Concrete Conversion At A Glance

What The Cubic Feet To Cubic Yards Concrete Calculator Shows

The Tool Keeps The Exact Unit Conversion Separate From Job-Site Planning Adjustments So You Can See The Base Volume First, Then Decide Whether To Add Waste, Order Rounding, Bag Yield Or Cost.

ft³

Cubic Feet

Enter A Known Cubic-Foot Volume Or Let The Calculator Build It From Dimensions.

yd³

Cubic Yards

Convert The Base Volume To The Unit Commonly Used For Ready-Mix Concrete Orders.

27

Exact Factor

One Cubic Yard Contains Exactly 27 Cubic Feet.

+

Waste Allowance

Add Only The Extra Percentage You Want For Real-World Variations.

$

Concrete Cost

Enter Your Own Price Per Cubic Yard Instead Of Using A Fixed Market Assumption.

PDF

PDF Result

Save The Main Conversion And Planning Numbers For Your Project Notes.

Cubic Feet To Cubic Yards Guide

How To Convert Cubic Feet To Cubic Yards For Concrete

Concrete quantity is a volume problem. Square feet describe surface area, but a concrete order must also account for thickness. Once a project is expressed in cubic feet, converting that volume to cubic yards is straightforward because one cubic yard contains exactly 27 cubic feet. The basic conversion is useful for slabs, patios, sidewalks, driveways, footings, pads, steps, repair pours and many other concrete jobs where measurements may begin in feet and inches while ready-mix pricing is quoted by the cubic yard.

The Cubic Feet to Cubic Yards Concrete Calculator above separates the geometric calculation from planning choices. That distinction matters. Dividing cubic feet by 27 gives the exact mathematical conversion. Adding a waste allowance, rounding an order, or estimating bags are separate decisions that depend on the project, the accuracy of the measurements and the way the concrete will be supplied.

Cubic Feet To Cubic Yards Formula

Convert ft³ To yd³Cubic Yards = Cubic Feet ÷ 27

For example, 54 cubic feet of concrete equals 2 cubic yards because 54 ÷ 27 = 2. A volume of 81 cubic feet equals 3 cubic yards. A volume of 13.5 cubic feet equals 0.5 cubic yard. Because the relationship is exact, you do not need an approximate conversion factor when moving directly between these two U.S. customary volume units.

Cubic Yards To Cubic Feet Formula

Convert yd³ To ft³Cubic Feet = Cubic Yards × 27

The reverse conversion is equally simple. Multiply cubic yards by 27. This can be useful when a supplier quote is in cubic yards but a bagged product, small mixer, form, or project plan is described in cubic feet. For example, 1.5 cubic yards equals 40.5 cubic feet, while 4 cubic yards equals 108 cubic feet.

Quick Cubic Feet To Cubic Yards Conversion Table

Cubic FeetCubic YardsCalculation
1 ft³0.0370 yd³1 ÷ 27
5 ft³0.1852 yd³5 ÷ 27
10 ft³0.3704 yd³10 ÷ 27
13.5 ft³0.5000 yd³13.5 ÷ 27
20 ft³0.7407 yd³20 ÷ 27
27 ft³1.0000 yd³27 ÷ 27
40.5 ft³1.5000 yd³40.5 ÷ 27
54 ft³2.0000 yd³54 ÷ 27
81 ft³3.0000 yd³81 ÷ 27
108 ft³4.0000 yd³108 ÷ 27

Why There Are 27 Cubic Feet In A Cubic Yard

A yard is three feet long. Volume is three-dimensional, so the length relationship must be applied in all three directions: length, width and height. A cube measuring 1 yard on every side therefore measures 3 feet by 3 feet by 3 feet. Multiplying 3 × 3 × 3 gives 27 cubic feet. This is why dividing by 27 converts cubic feet to cubic yards. NIST lists the international foot as exactly 0.3048 meter and the yard as exactly 0.9144 meter, supporting the exact 3-to-1 length relationship used here. You can review the official conversion-factor guidance in the NIST Guide to the SI conversion factors.

How To Calculate Cubic Feet Of Concrete From Dimensions

If you do not already know the cubic feet, calculate volume from the project dimensions first. For a rectangular slab or pad, multiply length in feet by width in feet by depth in feet. Because concrete thickness is commonly measured in inches, divide the depth in inches by 12 before multiplying.

Rectangular Concrete VolumeCubic Feet = Length (ft) × Width (ft) × [Depth (in) ÷ 12]

Suppose a patio is 12 feet long, 10 feet wide and 4 inches thick. The 4-inch thickness equals 0.3333 foot. The volume is approximately 12 × 10 × 0.3333 = 40 cubic feet. Dividing 40 by 27 gives approximately 1.4815 cubic yards before any waste or ordering allowance is added.

Square Feet To Cubic Yards Of Concrete

If the surface area is already known, you do not need to re-enter length and width. Multiply square feet by depth in feet to get cubic feet, then divide by 27. The Area + Depth option in the calculator performs both steps. This is useful when a takeoff, floor plan, paving plan or measurement app already gives the area in square feet.

Square Feet + Thickness To Cubic YardsCubic Yards = Square Feet × [Depth (in) ÷ 12] ÷ 27

Concrete Volume Per 100 Square Feet

Concrete ThicknessCubic Feet Per 100 ft²Cubic Yards Per 100 ft²
2 in16.67 ft³0.6173 yd³
3 in25.00 ft³0.9259 yd³
4 in33.33 ft³1.2346 yd³
5 in41.67 ft³1.5432 yd³
6 in50.00 ft³1.8519 yd³
8 in66.67 ft³2.4691 yd³
10 in83.33 ft³3.0864 yd³
12 in100.00 ft³3.7037 yd³

Worked Example: Concrete Slab In Cubic Feet And Cubic Yards

Consider a slab 20 feet long, 12 feet wide and 4 inches thick. First convert the thickness: 4 ÷ 12 = 0.3333 foot. Next calculate cubic feet: 20 × 12 × 0.3333 ≈ 80 cubic feet. Then convert to cubic yards: 80 ÷ 27 ≈ 2.963 cubic yards. If you decide to add a 5% planning allowance, the adjusted volume is approximately 3.111 cubic yards before any supplier-specific order rounding.

Keep The Steps Separate: 80 ft³ is the geometric volume. About 2.963 yd³ is the exact unit conversion. About 3.111 yd³ is a planning quantity only after a 5% allowance is intentionally added.

How Much Extra Concrete Should You Add?

There is no universal waste percentage that is correct for every job. A precisely formed slab on a stable prepared base may need less contingency than an irregular excavation, a footing trench with rough sides, or a project with multiple transitions and thickened areas. The calculator therefore starts the waste field at 0 rather than assuming a percentage for you.

Before adding extra concrete, consider measurement accuracy, subgrade variation, form movement, trench over-excavation, thickened edges, beams, steps, slopes, pump or chute handling and supplier minimum-order rules. For structural or engineered work, use the project drawings and supplier guidance rather than treating a generic percentage as a design rule.

Should You Round A Concrete Order?

The exact conversion can produce a number such as 2.963 cubic yards, but a supplier may sell or schedule concrete in specific increments and may also have minimum load or short-load policies. The calculator includes optional order rounding so you can explore a planning quantity, but it does not assume a supplier's rule. Enter the supplier's real ordering increment if you want the estimate to reflect a quote more closely.

Cubic Yards And Ready-Mix Concrete

Ready-mix concrete is commonly discussed by volume, and cubic yards are widely used in the United States. This makes ft³-to-yd³ conversion especially useful when project dimensions are measured in feet and inches. Once you know the cubic yards, you can compare the quantity with local quotes, delivery requirements and truck scheduling. For a driveway-specific workflow, use the Concrete Driveway Calculator, which is better suited to long rectangular pours and driveway sections.

Using Bagged Concrete Instead Of Ready Mix

For small repairs or isolated pours, bagged concrete may be more practical than a ready-mix delivery. Bag coverage is usually stated as an approximate yield, often in cubic feet. Because products and bag sizes differ, the calculator does not guess a yield. Enter the yield from the exact product packaging or technical data sheet. The tool then divides the adjusted cubic-foot requirement by your entered bag yield and rounds up to whole bags.

If bag yield is the main question, the Concrete Bag Yield Calculator provides a more detailed bag-focused workflow. If you are proportioning cement, sand and aggregate rather than using premixed bags, use the Concrete Mix Calculator.

Example Bag Calculation From Cubic Feet

Assume a small pad needs 9 cubic feet after the planning allowance. If the exact bag you are using states a yield of 0.60 cubic foot per bag, the planning estimate is 9 ÷ 0.60 = 15 bags. If another product yields 0.45 cubic foot per bag, the same 9 cubic feet would require 20 bags. This is why the yield field should come from the actual product rather than a generic bag weight assumption.

Estimating Concrete Cost Per Cubic Yard

The optional cost field multiplies the final planning quantity in cubic yards by the price per cubic yard you enter. It is intentionally editable because concrete prices vary by supplier, region, mix specification, delivery distance, fuel charges, short-load fees, pumping requirements and other project conditions. The result should therefore be treated as a concrete-only planning number, not a complete installed-project price.

Concrete-Only Cost EstimateEstimated Cost = Final Planning Cubic Yards × Your Entered $/yd³ Rate

Common Cubic Feet To Cubic Yards Mistakes

  • Dividing by 3 instead of 27. Three feet equals one yard for length, but volume is three-dimensional, so cubic feet must be divided by 27.
  • Using inches as feet. A 4-inch slab is not 4 feet deep. Divide inches by 12 before calculating cubic feet.
  • Stopping at square feet. Surface area alone cannot determine concrete volume; thickness is required.
  • Adding waste before checking the base volume. Keep the exact geometry visible so you know how much extra has actually been added.
  • Assuming every bag has the same yield. Use the specific product's stated yield.
  • Treating cost per yard as the full project cost. Labor, base preparation, reinforcement, forms, finishing, delivery and equipment may be separate.
  • Ignoring thickened edges or footings. These should be calculated as additional volumes when they are not already included in the main slab dimensions.

How To Handle Multiple Concrete Sections

If a project contains several sections with different dimensions, calculate each section separately in cubic feet and add the results before converting the total to cubic yards. This is usually more accurate than forcing an irregular shape into one large rectangle. For identical sections, the calculator's quantity field can multiply the volume automatically.

For example, if Section A is 30 ft³, Section B is 18 ft³ and Section C is 6 ft³, the combined base volume is 54 ft³. Divide 54 by 27 to get 2 yd³. Any waste allowance should then be applied according to the way you plan to order and place the concrete.

How Accurate Is A Cubic Feet To Cubic Yards Concrete Calculator?

The unit conversion itself is exact. The uncertainty comes from the measurements and project assumptions. If the length, width or depth is wrong, the converted result will also be wrong. Depth deserves particular attention because small changes over a large area can materially change the volume. Measure the actual form dimensions and prepared base where appropriate, and account separately for beams, haunches, curbs, steps, piers or other shapes that add concrete.

Cubic Feet, Cubic Yards And Cubic Meters

Some specifications, product literature or international references use cubic meters instead of cubic yards. NIST's conversion tables list one cubic foot as approximately 0.02831685 cubic meter and one cubic yard as approximately 0.7645549 cubic meter. Those metric conversions are useful when comparing documentation across unit systems, but the direct ft³-to-yd³ relationship remains exactly 27 to 1. See the NIST volume conversion table for authoritative unit factors.

Best Way To Use This Calculator When Comparing Concrete Quotes

  1. Measure the project and calculate the base volume with no waste added.
  2. Review the base cubic feet and base cubic yards.
  3. Add only the contingency allowance appropriate to the real job conditions.
  4. Use the supplier's real order increment if you choose an order-rounding option.
  5. Enter the supplier's quoted price per cubic yard if you want a concrete-only cost comparison.
  6. Keep delivery fees, pumping, reinforcement, forms, labor, finishing and tax separate unless the quote specifically includes them.
  7. Save the PDF result so the dimensions and assumptions are easy to compare with later quotes.

Concrete Planning Checklist Before You Order

  • Confirm the finished length and width.
  • Confirm the concrete thickness or structural depth.
  • Check whether any thickened edges, beams, footings or steps need separate volume calculations.
  • Measure in consistent units and convert inches to feet correctly.
  • Review access for the ready-mix truck, chute, buggy or pump.
  • Confirm supplier minimums, delivery charges and ordering increments.
  • Verify the required concrete specification or strength from the project documents.
  • Have forms, reinforcement, base preparation and placing crew ready before delivery.
Important: A volume calculator helps with quantity planning. It does not determine slab thickness, reinforcement, concrete strength, joint spacing, footing dimensions or other structural requirements. Those decisions should come from applicable project documents, codes, engineering requirements and qualified local professionals where required.
Fast Reference

Concrete Volume Relationships Worth Remembering

These Relationships Make It Easier To Check A Calculation Before You Order.

27

ft³ Per yd³

One Cubic Yard Contains Exactly 27 Cubic Feet.

0.0370

yd³ Per ft³

One Cubic Foot Is 1/27 Of A Cubic Yard.

12

Inches Per Foot

Divide Concrete Depth In Inches By 12 Before Multiplying Feet.

3

Feet Per Yard

The Three-Foot Length Relationship Becomes 27 When Cubed.

Worked Concrete Examples

Cubic Feet To Cubic Yards Examples For Common Concrete Jobs

The examples below show base geometric volume only unless otherwise noted. Real projects may include separate features or planning allowances.

Example ProjectDimensionsBase Cubic FeetBase Cubic Yards
Small Pad6 ft × 6 ft × 4 in12.00 ft³0.4444 yd³
Patio12 ft × 10 ft × 4 in40.00 ft³1.4815 yd³
Walkway Section30 ft × 4 ft × 4 in40.00 ft³1.4815 yd³
Driveway Section20 ft × 10 ft × 5 in83.33 ft³3.0864 yd³
Garage Slab Example20 ft × 20 ft × 4 in133.33 ft³4.9383 yd³
Thicker Equipment Pad10 ft × 8 ft × 8 in53.33 ft³1.9753 yd³
Questions & Answers

Cubic Feet To Cubic Yards Concrete Calculator FAQs

Common Questions About Concrete Volume, ft³, yd³, Thickness, Waste And Bag Yield.

How many cubic feet are in one cubic yard of concrete?

There are exactly 27 cubic feet in one cubic yard. A cubic yard is 3 feet × 3 feet × 3 feet, and 3 × 3 × 3 = 27.

How do I convert cubic feet to cubic yards?

Divide cubic feet by 27. For example, 54 cubic feet ÷ 27 = 2 cubic yards.

How do I convert cubic yards back to cubic feet?

Multiply cubic yards by 27. For example, 2.5 cubic yards × 27 = 67.5 cubic feet.

How many cubic yards is 100 cubic feet?

100 ÷ 27 is approximately 3.7037 cubic yards before any waste or order rounding is added.

How many cubic feet is 5 cubic yards?

5 × 27 = 135 cubic feet.

How do I calculate concrete from square feet?

Multiply square feet by depth in feet to get cubic feet, then divide by 27. If depth is in inches, divide the inches by 12 first.

How many cubic yards does 100 square feet need at 4 inches thick?

100 square feet × 4/12 foot = about 33.33 cubic feet. Divide by 27 to get about 1.2346 cubic yards before any extra allowance.

Does the calculator automatically add 10% waste?

No. The waste field starts at 0 so you decide what, if any, contingency is appropriate for your project.

Can this calculator estimate concrete bags?

Yes. Enter the bag yield in cubic feet from the exact product information. If the yield field remains 0, the calculator leaves the bag estimate blank rather than guessing.

Can I estimate the cost of ready-mix concrete?

Yes. Enter your quoted price per cubic yard. The calculator multiplies that price by the final planning quantity. The result is a concrete-only estimate and may not include delivery or other charges.

Should I round up cubic yards before ordering?

Use the supplier's actual ordering rules. The calculator offers optional rounding increments for planning, but it does not assume that every supplier uses the same increment or minimum order.

Is the ft³ to yd³ conversion exact?

Yes. The direct relationship is exact: 27 cubic feet equals 1 cubic yard.

References & Related Tools

Sources And ConcreteCreek.com Calculators

NIST Guide To The SI

Official U.S. conversion-factor reference for customary and SI units, including cubic foot and cubic yard relationships to cubic meters.

View NIST Volume Conversion Factors
Concrete Driveway Calculator

Estimate driveway concrete from length, width, thickness, sections, waste and cost.

Open Driveway Calculator
Concrete Bag Yield Calculator

Estimate bags from total concrete volume and the specific yield printed on the product.

Open Bag Yield Calculator
Concrete Mix Calculator

Estimate cement, sand and aggregate quantities from a custom concrete mix ratio.

Open Mix Calculator