Estimate How Much Concrete A Planned Pour May Need Before You Order. Choose A Slab Or Pad, Footing Or Trench, Wall Pour, Or Column / Post Shape, Enter Your Own Dimensions, Add A Practical Waste Allowance, Round The Quantity For Ordering And See Cubic Feet, Cubic Yards, Optional Bag Quantity And Concrete-Only Cost In One Clear Result.
All Numeric Entries Start At 0. Pick The Closest Shape, Enter The Actual Project Dimensions And Use The Optional Ordering Fields Only When They Apply To Your Estimate.
Your Result Will Appear Here After You Press Calculate Concrete Pour.
The PDF Includes The Site Name, Pour Shape, Main Measurements, Waste Allowance, Base Volume, Order Quantity, Bag Estimate And Optional Concrete-Only Cost.
A Concrete Order Is Based On Volume, Not Surface Area Alone. For A Rectangular Pour, Convert Thickness Or Depth To Feet, Multiply The Three Dimensions, Then Divide Cubic Feet By 27 To Convert The Result To Cubic Yards.
The Tool Keeps The Geometric Quantity Separate From The Allowance And Ordering Choices So You Can See How Each Step Changes The Final Number.
See The Exact Geometric Volume From The Dimensions You Enter Before Any Extra Allowance.
Convert The Pour Into The Unit Commonly Used For Ready-Mix Concrete Ordering In The United States.
Add A User-Controlled Percentage For Real Site Differences Instead Of Hiding It Inside The Formula.
Enter The Actual Product Yield In Cubic Feet To Estimate Whole Bags For Small Concrete Pours.
Use Your Own Local Per-Yard Rate To Build A Concrete-Only Material Estimate.
Save The Main Pour Measurements And Result With ConcreteCreek.com Branding For Easy Reference.
A Concrete Pour Calculator Answers A Simple But Important Estimating Question: how much wet concrete volume is required to fill the space inside the forms, excavation, wall forms, footing trench or cylindrical hole? The arithmetic is straightforward when the shape is regular. The quality of the estimate depends much more on using the final dimensions that will actually be poured.
For a rectangular slab, pad, footing or trench, multiply length by width by depth. For a wall, multiply wall length by wall height by wall thickness. For a round column or cylindrical hole, use the area of a circle multiplied by height or depth. The calculator converts inch-based thicknesses to feet automatically and converts cubic feet to cubic yards by dividing by 27.
Concrete Volume (yd³) = Volume In Cubic Feet ÷ 27Square feet describe surface area, but concrete has thickness. A 400-square-foot slab at 4 inches thick does not use the same quantity as the same 400-square-foot area at 6 inches thick. Once depth is included, the estimate becomes three-dimensional. This is why a concrete pour calculator needs length, width and thickness rather than area alone.
The same principle applies to walls and footings. A long wall can use a substantial amount of concrete even if it is relatively thin. A narrow footing can also use significant volume when the run is long or deep. Treat each distinct shape separately when a project contains different dimensions.
Concrete slab thickness, wall thickness, footing width and footing depth are often measured in inches. Divide inches by 12 before multiplying them with dimensions entered in feet. For example, 4 inches is 0.3333 feet, 6 inches is 0.5 feet and 12 inches is 1 foot.
| Thickness / Depth | Equivalent Feet | Concrete Per 100 ft² | Concrete Per 1,000 ft² |
|---|---|---|---|
| 3 in | 0.250 ft | 0.93 yd³ | 9.26 yd³ |
| 4 in | 0.333 ft | 1.23 yd³ | 12.35 yd³ |
| 5 in | 0.417 ft | 1.54 yd³ | 15.43 yd³ |
| 6 in | 0.500 ft | 1.85 yd³ | 18.52 yd³ |
| 8 in | 0.667 ft | 2.47 yd³ | 24.69 yd³ |
Use the Slab / Pad mode for rectangular pours such as floors, patios, equipment pads and other flat sections. Measure the inside dimensions of the finished forms where possible. If the slab includes thickened edges, grade beams, turned-down sections or steps, calculate those added volumes separately rather than pretending the entire slab has one uniform thickness.
Irregular slabs can often be divided into rectangles. Calculate each rectangle, then add the results together. Curved edges may require a circle, semicircle or other geometric method. A single rectangular estimate is only as accurate as the shape it represents.
A continuous rectangular footing uses the same volume formula as a slab: length × width × depth. The difference is that footing width and depth may be controlled by structural plans, local code requirements and site conditions. This calculator does not select those dimensions. It only estimates the volume created by the numbers you enter.
Hand-dug or excavated trenches deserve special attention because the actual trench can become wider or deeper than the design dimension. Recheck the excavation before the pour. A small dimensional increase over a long footing run can change the concrete quantity noticeably.
For a straight wall, multiply length by height by thickness. If a wall contains large planned openings, offsets, pilasters or changes in thickness, break the wall into separate sections. You can also use the dedicated Concrete Foundation Wall Calculator when you need a wall-focused estimate with opening and footing logic.
Do not use an online quantity calculator to decide wall thickness, reinforcement or form pressure requirements. Those are design and construction issues that must come from the applicable project documents and qualified professionals.
A round concrete pour is a cylinder. Convert the diameter to a radius, calculate the circular area with π × radius², then multiply by height or depth. The Column / Post mode handles this automatically. If a steel or wood post occupies part of a hole, the actual displacement can be calculated more precisely than a generic percentage when accuracy matters.
Volume = π × Radius² × HeightThere is no single waste percentage that is correct for every concrete pour. Well-built forms on a carefully prepared base may be measured closely. Excavations, post holes, irregular subgrade and long trenches can be less predictable. The calculator therefore leaves the allowance at 0 by default and lets you choose a percentage that reflects the real project.
Bagged concrete can be practical for small pours, repairs and isolated post holes. The bag count can become very large as volume increases. Ready-mix delivery can be more practical for larger continuous pours, but the best choice depends on site access, required concrete specification, crew capacity, placement rate and local supply conditions.
Bag yield is not determined by bag weight alone. Use the yield printed on the exact product data sheet or bag instructions. Enter that yield in cubic feet in the calculator. The tool divides the waste-adjusted volume by the entered yield and rounds up to whole bags.
The quantity calculation is geometric. Cost is a separate layer. Enter a local per-cubic-yard rate only if you have a useful current figure for your project. A supplier quote may include or exclude delivery, fuel adjustments, short-load fees, environmental charges or other services. A contractor quote can include labor, forms, reinforcement, finishing, pumping, excavation and more. The calculator therefore labels its optional result as concrete-only cost.
For a broader project budget, use the Concrete Cost Per Square Foot Calculator when your project is better compared on a square-foot basis, or use a dedicated concrete cost calculator for material budgeting.
This page estimates volume. It does not determine slab thickness, footing dimensions, wall thickness, column diameter, reinforcement, bar spacing, welded wire reinforcement, post-tensioning, concrete strength, exposure class, air content, slump, joints, base preparation, drainage, formwork, curing or structural capacity. The American Concrete Institute publishes consensus-based standards and construction specifications, but which requirements apply to a project depends on the project documents and governing jurisdiction.
Concrete placement also involves safety. Cutting, drilling, grinding or otherwise disturbing concrete and related materials can create respirable crystalline silica. Follow applicable OSHA requirements, jobsite safety procedures and manufacturer instructions.
A reliable quantity is only one part of a successful concrete pour. Before ordering, the site needs to be ready for the material to move from the truck to the forms without avoidable delay. That means checking access, confirming the placement route, making sure forms and reinforcement are complete, arranging the crew and tools, and understanding whether the concrete will be discharged directly, moved by chute, buggy, conveyor or pump.
The calculator can help establish how many cubic yards the geometry requires, but it cannot predict every site delay or placement issue. The order quantity should be reviewed alongside the actual pour sequence. If a project has several separated sections, decide whether they will be placed in one delivery or as separate pours. If the placement rate is slow, discuss timing and truck spacing with the supplier before the day of the pour.
Forms and excavations are where theoretical dimensions become real dimensions. A slab that was planned at a uniform depth may have low spots. A trench may flare wider in loose soil. A drilled hole may be larger than the nominal auger diameter. A wall form may include pilasters, ledges, steps or offsets that were not included in the first estimate. Measuring after final preparation is often more useful than relying only on an early takeoff.
For large or expensive pours, break the work into logical zones and calculate them independently. A zone-by-zone takeoff makes it easier to see where the concrete is going and reduces the chance of missing a thickened section. Keep the base geometric quantity, the waste allowance and any supplier rounding as separate numbers so the estimate remains understandable.
Volume does not tell you which concrete mixture to order. Strength, air entrainment, slump, aggregate size, exposure requirements and other mixture characteristics depend on the project. The correct specification may come from drawings, specifications, an engineer, a builder, local requirements or other contract documents. Do not substitute a quantity calculator for those requirements.
When speaking with the supplier, describe the project and provide the specification exactly as required. Also confirm whether the quoted rate is concrete-only or delivered, what minimum load rules apply, and whether there are charges for short loads, waiting time, additional mileage, fuel or other services.
A correct quantity can still be difficult to place if the truck cannot reach the forms. Check overhead clearance, driveway capacity, turning room, gates, soft ground, slopes and the distance from the truck to the pour. If direct discharge is not practical, plan the alternative method in advance. Pumping can make some pours more practical, but pumping is a separate service and should not be assumed to be included in a per-yard concrete rate.
Temperature, wind, sun, rain and site conditions can influence concrete placement and finishing. The American Concrete Institute publishes technical resources related to concrete construction and placement, including guidance for hot and cold weather conditions. The calculator does not change the volume based on weather, so weather planning must be handled separately from the quantity estimate.
Coordinate the crew, equipment and delivery schedule so the concrete can be placed continuously where the project requires it. If a placement must be interrupted, construction-joint requirements are a project detail rather than a calculator decision.
This Reference Table Shows Approximate Cubic Yards For Simple Rectangular Pours Before Any Waste Allowance. It Is Useful As A Reasonableness Check, But Your Actual Project Should Be Calculated From Its Real Dimensions.
| Area | 4 in Thick | 5 in Thick | 6 in Thick | 8 in Thick |
|---|---|---|---|---|
| 100 ft² | 1.23 yd³ | 1.54 yd³ | 1.85 yd³ | 2.47 yd³ |
| 250 ft² | 3.09 yd³ | 3.86 yd³ | 4.63 yd³ | 6.17 yd³ |
| 500 ft² | 6.17 yd³ | 7.72 yd³ | 9.26 yd³ | 12.35 yd³ |
| 750 ft² | 9.26 yd³ | 11.57 yd³ | 13.89 yd³ | 18.52 yd³ |
| 1,000 ft² | 12.35 yd³ | 15.43 yd³ | 18.52 yd³ | 24.69 yd³ |
The Table Below Demonstrates The Calculation Method With Illustrative Dimensions. These Are Quantity Examples, Not Recommendations For Structural Size, Concrete Specification Or Current Contractor Pricing.
| Pour Type | Example Dimensions | Base Cubic Feet | Base Cubic Yards | With 10% Allowance |
|---|---|---|---|---|
| Small Slab | 12 ft × 10 ft × 4 in | 40.00 ft³ | 1.48 yd³ | 1.63 yd³ |
| Patio | 20 ft × 15 ft × 4 in | 100.00 ft³ | 3.70 yd³ | 4.07 yd³ |
| Footing Run | 40 ft × 16 in × 8 in | 35.56 ft³ | 1.32 yd³ | 1.45 yd³ |
| Wall | 30 ft × 8 ft × 8 in | 160.00 ft³ | 5.93 yd³ | 6.52 yd³ |
| Round Pier | 18 in diameter × 4 ft deep × 4 | 28.27 ft³ | 1.05 yd³ | 1.15 yd³ |
Use examples only to understand the math. Real orders should be based on the actual forms or excavation, project documents and supplier ordering rules.
Use A More Specific Calculator When One Part Of The Project Needs Additional Inputs Or A Different Estimating Method.
Build A Square-Foot Cost Estimate With Material And Project Cost Inputs.
Open Cost Per Square Foot CalculatorEstimate Wall Volume, Multiple Walls, Openings And Continuous Footings.
Open Foundation Wall CalculatorUse A Dedicated Tool For Rectangular Concrete Slabs And Pads.
Open Concrete Slab CalculatorEstimate Concrete Volume For Continuous And Rectangular Footings.
Open Footing CalculatorAnswers To Common Questions About Cubic Yards, Waste, Bags, Pour Shapes And Ordering.
Calculate the three-dimensional volume of the space being filled. For a rectangular pour, multiply length × width × depth after converting compatible units. Divide cubic feet by 27 to get cubic yards.
One cubic yard contains 27 cubic feet. This conversion is built into the calculator.
Thickness is one of the three dimensions in the volume calculation. Increasing thickness increases the volume across the entire slab area, so even a small thickness change can materially change the total concrete quantity.
Not automatically. The appropriate allowance depends on how predictable the forms, excavation and site conditions are. The calculator starts at 0 so you can choose an allowance that suits the actual project.
Yes for volume estimating when a driveway section can be represented as a slab or as several simple slab sections. Structural thickness, reinforcement, joints and subbase requirements must be determined separately.
Yes. The Footing / Trench mode calculates a rectangular continuous footing from total length, width and depth.
Yes for straight rectangular wall sections. For multiple walls, openings and combined footing logic, the dedicated Concrete Foundation Wall Calculator may be more convenient.
Yes. Use Column / Post mode and enter the actual hole diameter, depth and quantity. The calculator treats each hole as a cylinder.
Enter the yield in cubic feet printed on the exact concrete product. The calculator divides the waste-adjusted cubic feet by that yield and rounds up to a whole bag.
No. The optional cost multiplies the rounded cubic-yard quantity by the per-yard rate you enter. Labor, pumping, forms, reinforcement, excavation and other charges are not added automatically.
The result stays hidden until you press Calculate Concrete Pour so the page starts clean and the estimate is based on the dimensions you actually enter.
Calculate each thickness zone as a separate shape, then add the quantities together. This is generally clearer than using one average thickness when the sections are materially different.
Suppliers may use specific order increments or minimum quantities. The calculator includes optional rounding controls, but confirm the actual ordering rule with the supplier before placing the order.
No. Concrete strength and mix requirements must follow the plans, specifications and applicable project requirements. A volume calculator cannot select the correct structural mix.
No. It is a concrete quantity estimator only. Structural dimensions, reinforcement, loads, soil conditions, jointing and other design issues are outside the scope of this calculator.
Use Current Project Documents, Supplier Information And Authoritative Technical Guidance Alongside Any Online Concrete Quantity Estimate.
ACI Publishes Consensus-Based Concrete Design Codes And Construction Specifications.
View ACI StandardsACI Technical Resources Include Guidance And Publications Related To Placing And Finishing Concrete.
View Placement ResourceIndustry Resources From The National Ready Mixed Concrete Association.
Visit NRMCA ResourcesConstruction Safety Information For Work That Can Create Respirable Crystalline Silica Dust.
Read OSHA Guidance